# Envision says 800-volt DC power system is serving AI workloads
> The company describes a live installation that combines power conversion, batteries and controls at its Ulanqab campus.
By BIGCHANGE.AI Editorial
Published: 2026-11-03T17:29:38.330Z
Updated: 2026-11-03T17:29:38.330Z
Canonical: https://bigchange.ai/blog/envision-800v-dc-ai-data-center-power

AI-generated conceptual illustration by BIG CHANGE.
Envision says its 800-volt direct-current system is powering AI workloads at its Ulanqab campus in China.
## The big change
- The company reports a live installation.
- Transformers, batteries and controls operate together.
- Higher-voltage DC can reduce conversion stages in AI power distribution.
In its November 2 [announcement](https://www.prnewswire.com/news-releases/envision-achieves-worlds-first-commercial-deployment-of-integrated-800v-dc-sst-based-power-system-in-large-scale-ai-data-center-302926109.html), Envision says solid-state transformers convert 10-kilovolt input to an 800-volt DC bus. Batteries provide short-duration support and backup; a controller coordinates them with the transformers as computing demand changes.
[NVIDIA describes](https://blogs.nvidia.com/blog/800-vdc-power-architecture-ai-factory/) conventional power delivery as involving multiple conversions between alternating and direct current. Its proposed 800-volt architecture reduces conversion stages. One hybrid approach places a power rack alongside computing equipment in an existing AC facility; a facility-scale power block is a separate design for new sites.
A [Schneider Electric paper](https://www.se.com/us/en/download/document/SPD_WP213_EN/) identifies protection, grounding and energy-storage integration as design considerations. Operators evaluating these architectures must consider how electrical protection and operating arrangements fit their chosen facility; selecting a distribution voltage alone does not settle those decisions.
Envision calls the deployment a world first, without independent verification. It gives no operating capacity or measured efficiency. The campus opened in August; its 3-gigawatt capacity and up to one million accelerators are full-build plans.
[Earlier BIG CHANGE coverage](https://bigchange.ai/blog/ase-powersip-vertical-ai-processor-power-delivery) examined [ASE’s separate chip-level voltage-regulator packaging design](https://ase.aseglobal.com/press-room/ase-expands-powersip-platform-for-next-generation-ai-power-delivery/).
## Sources
- [Envision deployment announcement](https://www.prnewswire.com/news-releases/envision-achieves-worlds-first-commercial-deployment-of-integrated-800v-dc-sst-based-power-system-in-large-scale-ai-data-center-302926109.html) — Company description of the live deployment and planned campus; capacity and efficiency results are not independently verified.
- [NVIDIA 800 VDC architecture](https://blogs.nvidia.com/blog/800-vdc-power-architecture-ai-factory/) — Separate industry explanation of power conversion and alternative facility architectures.
- [Schneider Electric 800 VDC principles](https://www.se.com/us/en/download/document/SPD_WP213_EN/) — Independent supplier discussion of protection, grounding and deployment considerations.
- [ASE PowerSiP announcement](https://ase.aseglobal.com/press-room/ase-expands-powersip-platform-for-next-generation-ai-power-delivery/) — Separate chip-level power delivery design covered previously.
The BIG CHANGE newsletter
The big picture. At your pace.
Recent stories on AI and robotics, the shifts worth watching and practical ideas to use. Choose a daily briefing, weekly digest or monthly perspective.
Next scheduled send (UTC): . Your first edition arrives at the next scheduled send after you confirm.
Your privacy, your choice.
Necessary storage supports site security and remembers your choices. Optional Google Analytics stays off until you allow it. You can read every story with necessary storage only. Privacy details